Estimated lead time: 16-18 weeks
| Finish | Fairfax Taupe and Natural |
| Fabric | 100% Olefin (Performance Fabric) |
| Assembly Required | No |
| Material | Olefin and Teak Wood |
Estimated lead time: 16-18 weeks
| Finish | Fairfax Taupe and Natural |
| Fabric | 100% Olefin (Performance Fabric) |
| Assembly Required | No |
| Material | Olefin and Teak Wood |
Sink into soothing warmth to experience deep relaxation and renewal. Choose from custom options to design your ideal retreat.